Construction forward look w/c 11th May

As part of our commitment to providing regular updates for local residents during this period of lockdown we are pleased to provide the following information regarding planned construction activity for the week commencing 11th May.

During this week, we will be installing perimeter scaffolding to the four corners of Block D. We will continue to strip materials from the roof of Block F and remove the roof structure, using the temporary water supply that we have installed to this area to help reduce dust and debris as we do this. Other ongoing work will include the removal of blockwork to both the front and rear elevations of block F by workforce on the scaffolding, the removal of flooring within block F and the installation of drainage runs externally, using excavators, dumpers and diggers both inside and outside. A towable water bowser remains in use to dampen down work areas around the site on a regular basis.

Following a review, all work on site will now revert to commencing from 8am. This will ensure we can stay on schedule and keep the number of days of work to a minimum. These timings are in line with the regulated working hours in the approved planning permission. We continue to monitor noise and vibration levels daily to ensure they are within permitted levels.

Please note that the work we have planned may sometimes change due to the level of available workforce. We will do our best to keep you updated with any material changes that may affect you. On social media please follow @ChocFactoryBris on Twitter, Facebook and Instagram as we will keep this updated with any news.

If you have any questions or concerns regarding work activities at any time please email chocfactoryresidents@sweetconstruct.co.uk.